Day 82 & 83 Still working on Wiring
Breezeway Beautification
The breezeway may never be finished (the house may never be finished either) but on Friday, Dave made the outside look pretty. He added some trim and caulk and painted the wood and at least from the outside, it looks great--the above picture is the front and below is the back.
Let me remind you that the inside still looks like this though.
Dave took off work on Thursday and Friday to work on wiring. On Thursday night, our friends Anne and Chad both helped us to run some long runs through the basement. It sure was nice to have 4 people pulling wires instead of just the 2 of use. On Friday, Dave spent the day tacking down those wires through the basement and bringing them to the fuse box.
On Thursday, Dave and I also took the old copper pipes in for recycling and made $200 and then we went shower shopping. We are still having a hard time finding the right shower for the master bath--in stock and at a decent price.
Speaking of showers...on Thursday night, the cheap shower in the basement broke while Lauryn was showering and shot out and hit her in the back. It was quite a shock!!
Comments
Post a Comment