Day 67 & 68-Plumbing Progress
Some Days it Just Stays the Same
This week our plumber has been working during the day some days and we are getting really close to getting all the new water running in the house. Since all we have right now is one sink, one fridge, one shower, and a washing machine all within a small space in the basement, we decided to take out all the old copper pipes and switch the entire house to PEX. Above you see the new PEX heading up with the old water softener copper pipe still in place in front of it. We are almost ready to switch on the new water softener and we are waiting for the new full house water filter to be delivered too.
Dave has also continued to work on putting holes in the joists for the electrical runs to the kitchen. Not much to show there except more holes and a bucket of wood shavings.
The wood floor also was delivered so that we can patch the remaining wood floor in the hallway.
Comments
Post a Comment