Day 65--Big Clean up

 

Big Stump

After work, Dave and I measured the attic for the LVL beams to take out the wall between the kitchen and living room and to fix the sinking roof. Mostly Dave took up the plywood and then took out the disgusting insulation and I just handed him things. We need a total of 12 lvl beams--ranging from 6 foot to 17 foot. They will be delivered on Friday. 

After dinner, Dave started trying to dig up this big stump by the road. We have several stumps that need to be taken out all around the house, but this one Dave is determined to get rid of first. 

Then we cleaned--WHY--cause THE CABINETS COME TOMORROW!!!

Just in case you forgot--the beautiful green carpet still covers the living room and half of the kitchen floor. 