Day 34-Bathtub Build
Still Working on Making it Livable
Dave caught up on some building tonight so that the plumber can keep working. First, he built out the walls around the bathtub in the main bathroom and then he installed it.
His second project was getting the slider door frame installed on the toilet room in the master bathroom.
While he worked, I continued to unpack and move around boxes to make livable spaces. The area of the kitchen with the carpet removed reminds us of a coffee shop, so that is what we call it. We also installed the printer there so we could all work and do school from home. That area comes in handy when people come to the house--tonight we met with Leo there to order our windows for the kitchen and bathroom. They should be here in about 3 weeks.
Comments
Post a Comment